SMM020

SMM020 Installation of Underground Fiber – Springfield to Noble Hill

Status: Closed

Date Opened: 6/8/2012

Date Closed: 6/29/2012 2:00 p.m.

Description: Sho-Me proposes to deploy a fiber-based middle-mile network in a 30-county region of Missouri to expand broadband capabilities. Project construction will consist of 1,380 fiber miles of which about 500 miles is to be new build, characterization of 17 existing fiber segments, 15 new PoP shelters, 19 existing PoP locations, 82 DWDM degrees and 41 spans.

This request for bid (RFB) issued by Sho-Me to solicit bids for contractors who wish to provide labor & equipment to install the Sho-Me supplied innerduct, vaults, 72 fiber shielded underground cable, and aerial ADSS fiber optic cable to construct the proposed fiber optic back bone. The proposed route will connect to the existing backbone already in service by Sho-Me.

The Phase III Route F construction portion of the project involves deployment of approximately 25.8 miles of new fiber from Springfield to Noble Hill that will connect fiber Points of Presence (POP) locations and Community Anchor Institutions (CAI’s) along the fiber Route F (see Figure 2). This Phase III Route F construction contract RFB is for the route of underground fiber. The Contractor will submit a proposed bid and procedure of the installation of the innerduct, fiber, markers and vaults. This Phase III Route F Springfield to Noble Hill project will be only for the Backbone Fiber plant. The bid will be for the route, the bid units will be for changes from the proposed route. From the start date of July 30, 2012 there will be 6 months to finish the route.

Email all questions and concerns pertaining to this RFB to rfp@shometech.com.

Bid Package

Document Description
SMM020 Installation of Underground Fiber Springfield to Noble Hill.pdf Main SMM020 Bid Document– Acrobat PDF
Bid Transmittal Form Bid Tranmittal Form – Microsoft Excel
AIA Payment Bond.pdf AIA Payment Bond – Acrobat PDF
Bid Bond.doc Bid Bond – Microsoft Word
Master Service Agreement.pdf Master Service Agreement – Acrobat PDF
Buy American Form.xls Buy American Form – Microsoft Excel
Blanket Service Agreement.doc Blanket Service Agreement – Microsoft Word
Performance Bond.doc Performance Bond – Acrobat PDF
CD512.pdf Federal Form CD-512 – Acrobat PDF
Wage Determination.pdf Wage Determination – Acrobat PDF
Hold Harmless Agreement SMT.pdf Hold Harmless Agreement SMT – Acrobat PDF
Purchase Order Terms and Conditions.pdf Purchase Order Terms and Conditions – Acrobat PDF
Springfield to Noble Hill Construction Asbuilt Maps 8×11.pdf Springfield to Noble Hill Construction Asbuilt Maps – Acrobat PDF